Drilling

  • Explorotory drilling
  • bore
  • Casing and gravelling of the filter bed
  • Development by compressor
  • Installing the sounding head
  • Installation of the electric pump with all safety levels (thermal, voltage, water level, phase change)
  • Installation of a hydrometer to monitor the water table
  • The necessary connections to link the borehole to the water tank